This full remodel project was Designed and Planned by J. Graham of Bancroft Blue Design, the entire layout of the space was thoughtfully executed with unique blending of details, a one of a kind Coffer ceiling accent piece with integrated lighting, and a ton of features within the cabinets. The entire First floor was renovated, Stairs, and 2/3 of the second floor with the addition of a New 12'x12' Laundry Room. All New flooring, lighting, appliances and carpentry was installed as well as New windows and French Doors. With the collaboration of Tom Haas Construction and the assistance and fabrication of the cabinets by Fehrenbacher Cabinets the final design was completed in 2.5 months from Nov. 6 (demo) - Jan. 19, 2024(hand over).
Project Highlight Video